Pull PE liner pipe into the existing corroded and leaking steel pipe & shore transition for the effluent outfall using HDD equipment.

HDD rig set up onshore to pull liner pipe in the existing 16″ steel pipe
PE Pipestring, 315mm diameter, 324m long fabrication onshore
View of shore transition, NZDS work boat Shoman over the point where the shore transition section exits onto the seabed. Sheet pile structure at waters edge marks the location of the leak