• News
  • About Us
  • Services
    • Port and Harbour Engineering
    • Ocean Outfall & Submarine Pipelines
    • Coastal Processes & Engineering
    • Subsea Geotechnical Investigation
    • Mooring & Offshore Buoys
    • Temporary & Construction Works
    • Aquaculture Structures
    • Drone Survey
    • Design of Floating Berths
    • Explosives
  • Projects
    • Christchurch City Council Outfall
    • Christies Beach Ocean Outfall
    • Clandeboye Ocean Outfall
    • Diamond Harbour Pipelines Repair
    • Dong Won 701 Scuttling
    • Dunedin City Council Tahuna Outfall
    • Finegand Meatworks Outfall
    • Kiwi Dairy Wastewater Outfall, Hawera
    • NZ Refining – Marsden Point
    • PanPac Outfall Extension
    • ROC Oil Cliffhead Pipelay Project
    • Termap Offshore Loading Terminals, Argentina
    • Waimakariri District Council Wastewater Outfall
    • Waldronville Outfall Extension
    • More Experience
  • Staff
    • Gary Teear
    • Frank Dennis
    • Ernst Hustedt
    • Robert Eaton
    • Fred Teear
  • Contact Us
  • News
  • About Us
  • Services
    • Port and Harbour Engineering
    • Ocean Outfall & Submarine Pipelines
    • Coastal Processes & Engineering
    • Subsea Geotechnical Investigation
    • Mooring & Offshore Buoys
    • Temporary & Construction Works
    • Aquaculture Structures
    • Drone Survey
    • Design of Floating Berths
    • Explosives
  • Projects
    • Christchurch City Council Outfall
    • Christies Beach Ocean Outfall
    • Clandeboye Ocean Outfall
    • Diamond Harbour Pipelines Repair
    • Dong Won 701 Scuttling
    • Dunedin City Council Tahuna Outfall
    • Finegand Meatworks Outfall
    • Kiwi Dairy Wastewater Outfall, Hawera
    • NZ Refining – Marsden Point
    • PanPac Outfall Extension
    • ROC Oil Cliffhead Pipelay Project
    • Termap Offshore Loading Terminals, Argentina
    • Waimakariri District Council Wastewater Outfall
    • Waldronville Outfall Extension
    • More Experience
  • Staff
    • Gary Teear
    • Frank Dennis
    • Ernst Hustedt
    • Robert Eaton
    • Fred Teear
  • Contact Us

Dong Won

  • On August 27, 2021
  • 0 Comments
OCEL developed the Scuttling Procedure/Blast Plan for the scuttling of the Dong Won 701, a fire damaged 91 m long Korean Deep Sea trawler and implemented the plan in July 2021. The vessel was sunk using explosive charges set by OCEL at an EPA approved disposal location 25 nautical miles offshore Dunedin. OCEL designed the […]
Read More

Dominion Salt Works Seawater Intake

  • On January 15, 2021
  • 0 Comments
Dominion Salt works seawater intake structure installation and intake pipe extension to reinstate intake volumes reduced by tectonic uplift during the Kaikoura Earthquakes. November/December 2020.
Read More

Kaiapoi Marine Precinct

  • On September 29, 2019
  • 0 Comments
Kaiapoi Marine Precinct open September 2019
Read More

Port Otago Wharf Completion

  • On August 29, 2019
  • 0 Comments
Complete November 2019.
Read More

Pan Pac

  • On May 29, 2019
  • 0 Comments
Pull PE liner pipe into the existing corroded and leaking steel pipe & shore transition for the effluent outfall using HDD equipment.
Read More

Port Moresby

  • On April 19, 2019
  • 0 Comments
Completion of 200m long sheet piled quay facility at Port Moresby for Avenell Engineering Services.
Read More

Port Otago Wharf – Update

  • On August 29, 2018
  • 0 Comments
Progress on the new Port Otago Wharf at Port Charmers, scheduled for completion end of November 2019.
Read More

Panpac Stage 3 500m Pipe Pull – Hawkes Bay Napier

  • On March 12, 2018
  • 0 Comments
Read More

Port Otago Wharf

  • On November 7, 2017
  • 0 Comments
Start of pile driving at Port Chalmers for the new Port Otago wharf.
Read More

Hastings District Council ocean outfall diffuser

  • On April 6, 2017
  • 0 Comments
Installation of the Hastings District Council ocean outfall diffuser using the float and sink technique. 300m diffuser length replaced by 2 x 150 pipestrings 900mm in diameter. Replacement diffuser fabricated offshore then towed off the beach and floated to site April 2017.
Read More
Recent Posts
  • Dong Won
  • Dominion Salt Works Seawater Intake
  • Kaiapoi Marine Precinct
  • Port Otago Wharf Completion
  • Pan Pac
Recent Comments
    Archives
    • August 2021
    • January 2021
    • September 2019
    • August 2019
    • May 2019
    • April 2019
    • August 2018
    • March 2018
    • November 2017
    • April 2017
    Categories
    • Uncategorized
    Meta
    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    Scroll
    Copyright ©2020 OCEL - Offshore & Coastal Engineering Ltd. All Rights Reserved.