• News
  • About Us
  • Services
    • Port and Harbour Engineering
    • Ocean Outfall & Submarine Pipelines
    • Coastal Processes & Engineering
    • Subsea Geotechnical Investigation
    • Mooring & Offshore Buoys
    • Temporary & Construction Works
    • Aquaculture Structures
    • Drone Survey
    • Design of Floating Berths
    • Explosives
  • Projects
    • Christchurch City Council Outfall
    • Christies Beach Ocean Outfall
    • Clandeboye Ocean Outfall
    • Diamond Harbour Pipelines Repair
    • Dong Won 701 Scuttling
    • Dunedin City Council Tahuna Outfall
    • Finegand Meatworks Outfall
    • Kiwi Dairy Wastewater Outfall, Hawera
    • NZ Refining – Marsden Point
    • PanPac Outfall Extension
    • ROC Oil Cliffhead Pipelay Project
    • Termap Offshore Loading Terminals, Argentina
    • Waimakariri District Council Wastewater Outfall
    • Waldronville Outfall Extension
    • More Experience
  • Staff
    • Gary Teear
    • Frank Dennis
    • Ernst Hustedt
    • Robert Eaton
    • Fred Teear
  • Contact Us
  • News
  • About Us
  • Services
    • Port and Harbour Engineering
    • Ocean Outfall & Submarine Pipelines
    • Coastal Processes & Engineering
    • Subsea Geotechnical Investigation
    • Mooring & Offshore Buoys
    • Temporary & Construction Works
    • Aquaculture Structures
    • Drone Survey
    • Design of Floating Berths
    • Explosives
  • Projects
    • Christchurch City Council Outfall
    • Christies Beach Ocean Outfall
    • Clandeboye Ocean Outfall
    • Diamond Harbour Pipelines Repair
    • Dong Won 701 Scuttling
    • Dunedin City Council Tahuna Outfall
    • Finegand Meatworks Outfall
    • Kiwi Dairy Wastewater Outfall, Hawera
    • NZ Refining – Marsden Point
    • PanPac Outfall Extension
    • ROC Oil Cliffhead Pipelay Project
    • Termap Offshore Loading Terminals, Argentina
    • Waimakariri District Council Wastewater Outfall
    • Waldronville Outfall Extension
    • More Experience
  • Staff
    • Gary Teear
    • Frank Dennis
    • Ernst Hustedt
    • Robert Eaton
    • Fred Teear
  • Contact Us

Hastings District Council ocean outfall diffuser

  • On April 6, 2017
  • 0 Comments
Installation of the Hastings District Council ocean outfall diffuser using the float and sink technique. 300m diffuser length replaced by 2 x 150 pipestrings 900mm in diameter. Replacement diffuser fabricated offshore then towed off the beach and floated to site April 2017.
Read More
Recent Posts
  • OCEL wave buoy off Ulva Island
  • SALM mooring for REALNZ in Fiordland
  • Dong Won
  • Dominion Salt Works Seawater Intake
  • Kaiapoi Marine Precinct
Recent Comments
    Archives
    • August 2022
    • March 2022
    • August 2021
    • January 2021
    • September 2019
    • August 2019
    • May 2019
    • April 2019
    • August 2018
    • March 2018
    • November 2017
    • April 2017
    Categories
    • Uncategorized
    Meta
    • Log in
    • Entries feed
    • Comments feed
    • WordPress.org
    Scroll
    Copyright ©2020 OCEL - Offshore & Coastal Engineering Ltd. All Rights Reserved.