Finegand Meatworks Outfall

Finegand Meatworks Outfall

OCEL completed the design, contract preparation, tendering and Contract administration for the construction of a meatworks and fellmongery wastewater outfall to the Clutha River at Balclutha for Primary Producers Cooperative Society Limited. Design required the optimisation of discharge configuration and position, the operation of the existing outfall system during construction, and ensuring protection to the pipe from the extremes of flood and scour for a proposed 50 year design life.

Launch of one of the two outfall pipes to be buried and piled in place beneath the river bed.

 

Finegand Meatworks